Robotic Vacuum Cleaner with Automatic Recharge, Automatic Navigation, Anti-stumble, UV Germicidal

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-14 13:26

  • Browse the number:

    218

Send an inquiries
+
Yangfar Industry Co,Ltd
Contactaixin:

Contactaixin:

xrobot(Ms.)  

telephone:

Area:

Beijing

Address:

No. 456 Xingning Road, Jiangdong Industry District, Ningbo, Zhejiang, China (315000)

Website:

http://xrobot.tiarasoffantasy.com/

+
Model Number: C2-Black-#4205 Brand Name: Xrobot, ODM/OEM Key Specifications/Special Features: The detailed information please refer to the blow sheet Main Functions
  • Anti-falling sensor
  • Non-colliding and soft texture
  • Automatic Recharging
  • Automatic Navigation
  • UV germicidal
  • Scheduler
  • Sonic wall (virtual wall)
  • Wirelessremote control
  • 60-90 / 90-120mins variable cleaning time
  • Side brush, main brush and rubber brush that can be easily removed and fixed by hands, and efficiently clean edges and corners
  • Cleaning methods:special bounce, spiral, along wall, shape, polygonal spiral
  • Crawling up ability: 1.5cm (maximum)
Technical Parameter Materials ABS, PP Input Voltage 100-240V Output Voltage 24V DC Voltage of Battery 14.4V Ni-MH battery Unit Average Power 15W-31W Suction Power 3W Airflow 63.6 dm3/m Dust Capacity 0.37L Battery Capacity 1700mAh/2200mAh Charge Time 4-5 hours Working Time 60-90/90-120mins Unit Size 32*8.7cm (diameterxH) Packing Each one in color box Load Quantity 852pcs/20' container
1700pcs/40' container
2000pc/40' HQ container Packing List 1 x main unit
1 x charging base
1 x box of spare parts (side brush x 2 + filter x 2)
1 x remote control
1 x sonic wall
1 x battery pack
1 x charger
1 x manual
1 x cleaner brush (on the top of dust bin)
1 x rolling brush cleaner (on the back of charging base)
Shipping Information:
  • FOB Port: Shenzhen, China
  • Lead Time: 15 - 30 days
Main Export Markets:
  • Eastern Europe
  • North America
  • Mid East/Africa
  • Central/South America
  • Asia
  • Western Europe
  • Australasia

Other products